First: Architectural Restoration
Architectural restoration includes the reinforcement of the walls from the outside in the case of tombs and temples built of stone as well as (mosques, markets, schools, seasons, churches, monasteries) and restoration
Construction of fallen dams or reinforcement and injection of mountain rock in the case of tombs and temples in the rock, in case of partnerships or separations or the existence of layers of children in the natural composition of the rock or weak areas as well. Architectural restoration includes the work of new ceilings as well as the work of the tombs. Build Madamek or layers of falling stone cladding and complete the missing areas of Madamek.
II / Accurate Restoration:
Precise restoration is divided into:
1. Phase cleaning. 2-phase removal and extraction of salts. 3. Phase relay and installation.
4 - the restoration phase, which includes (assembly - completion) has preceded one of these other stages and that on both fixed monuments such as (tombs - temples - churches - monasteries mosques -
Schools - palaces (built of stone or mud brick or burnt bricks) as applicable to movable relics such as the existing antiquities of museums and palaces holdings of antiquities
Stone (such as small figurines (tungra) and pots and coffins) and glass traces such as (inlays and utensils) and this in addition to wall paintings displayed in museums.
General maintenance and periodic maintenance
It includes:
1- General Maintenance:
It is the impact of the protection as in the tombs in the desert areas, which are always exposed to the slaughter of the wind work bumpers
For these winds in the same way that was followed by the ancient Egyptian planting palms - desert trees near the tombs.
Noticeable /:
(They must not be placed in front of graves directly so as not to affect their roots on the basis of graves)
In the case of monuments in the middle of residential areas, especially the tombs in the rock, such as tombs (Bawiti in the Bahariya Oasis)
A wire fence shall be made at a distance farther from the perimeter of the tombs so as to prevent walking over it or construction or dumping of waste. In the case of tombs with open lounges and openings
Which are exposed to damage by taking insects and birds shelter is the work of a fine wire openings for these ceilings to prevent the entry of any of these organisms as well as the work of windows of this wire
In the openings in addition to this is the regular opening of these graves if they are closed so we put the stability of these objects and prefer to leave, especially Bat
شركة ترميم وصيانة بجدة
شركة دهانات بجدة
2. Periodic maintenance:
Make a permanent record for each cemetery where the restoration sections are accessible to areas to be used if the cemetery needs any maintenance or restoration, despite the importance
This record, it is still the restoration sections of the archaeological areas do not record the maintenance and restoration work carried out in the Pharaonic cemetery, whether carried out by foreign missions or
People or the Supreme Council of Antiquities and rely only on what is published, which is very little and on the memory of people who have experienced some stages of restoration while taking
Keep in mind that there is always a functional change. Periodic maintenance also includes periodic inspection of the relics areas in a work plan that is at least every six months or every year.
And record every trace in its registry so that any damage appears and try to remedy it quickly.